Friday 25 November 2011

Production Plan for the next Three Weeks



Three Week Plan

 Friday 25th November 2011 - Updating Blogs and finishing off Digi packs


26th - 27th November (Weekend) - Over the weekend we will be editing our digi packs and making sure that we are on schedule with our production plans and our Blogs.

Monday 28th November 2011 - Tester shots of the things we want to film such as the parachute men. 
Consultation with Molly about the things that we want her to do 
Summery: Planning of props and costumes.


Wednesday 30th November - Filming the close up shots of Molly. We will be using my house to do this as we are unable to use the Gallery at this time, we are doing the close up shots as this will not give away the fact that we are not in the Gallery and means that we have at least filmed a good part of the video.


Friday 2nd December 2011 - Edit everything that we have filmed, Plan our next step for filming, booking the Gallery for after the Alternative Prize has been taken down.


3rd-4th December (Weekend) - We will once again be filming some more, possibly the milk bottle scene as this can be done outside school with a plain background, maybe even the bouncy ball scene when they are coming down the stairs.

Monday 5th December 2011 - Going to the Gallery and asking Cassie if we are able to use the Gallery for filming as the Alternative prize should be taken down soon. 
Also planning for costumes and props to bring in on the day of filming. Consulting Molly again on what she needs to do for the day of filming.


Wednesday 7th December 2011 - Looking over all the footage that we have filmed so far and editing it all so that we know what we have left to film and what is a priority on our to do list.

No comments:

Post a Comment